Acies Group

Herne Germany

Client:

Vac Property One Sarl

Description

The scheme consisted of two phases of work.

Phase 1 was the introduction of new guttering and rainwater collection system to the underside of a podium deck car park to prevent leaking into the existing centre.

Phrase 2 was the relocation of escalators within the unit, creation of new openings and infilling of existing openings.

All design was carried out to DIN Standards and all drawings produced in German.

Project Team

Architect:

Chapman Taylor

Project Management:

Mercer and Miler

Structural Engineer:

Acies Group LLP

Copyright © 2018 Acies Group, part of RSK Group Ltd