Milliners Wharf, Manchester

Client:

City Lofts Group

Project Value:

£50m

Description

The development comprises of three phases. Phase 1 is for an 8 storey 160m long steel framed block which is constructed from Asymmetrical Fabsec Beams with deep profile decking to reduce the structural zone and minimise floor to floor heights. Phase 2 is for a 70m long 7 storey steel frame block and Phase 3 is for a 22-storey R.C Tower.

Project Team

Project Manager:

Goring Berry

Structural Engineer:

Acies Group LLP

M&E Consultant:

Hoare Lea

Architect:

DG3

Quantity Surveyor:

Goring Berry