Client:
Shrewsbury Diocese
Project Value:
?2.5m
Description
Acies Group undertook a Structural Survey of the existing school ahead of a proposed refurbishment scheme.
Due to various defects that came to light during the survey it was decided that demolition and rebuilding the structure in its entirety was the most economical way forward.
Acies Group carried out the detailed design of the building that was constructed using sustainable materials. This meant utilising timber portal frames with rainwater harvesting and wind turbine over an existing landfill.
Project Team
Architect:
OMF Derek Cox
Quantity Surveyor:
Davis Langdon
Structural Engineer:
Acies Group LLP
M&E Consultant:
Scott Wilson
Planning Supervison:
Davis Langdon