Client:
Vac Property One Sarl
Description
The scheme consisted of two phases of work.
Phase 1 was the introduction of new guttering and rainwater collection system to the underside of a podium deck car park to prevent leaking into the existing centre.
Phrase 2 was the relocation of escalators within the unit, creation of new openings and infilling of existing openings.
All design was carried out to DIN Standards and all drawings produced in German.
Project Team
Architect:
Chapman Taylor
Project Management:
Mercer and Miler
Structural Engineer:
Acies Group LLP